REFERENCE

Installation Cases

Heating, hot water and drying solutions — experience across many sectors proven by results on site.

Total 100

What 100 sites recorded

Every installation record from around 100 sites as of 2026. Savings vary with the previous equipment, usage pattern and electricity tariff.

  • 71%Nursing hospital heating cost — KRW 26M saved in five months
  • 70%Gochang eel farm — switched from Bunker C oil
  • 66%Lotte World — power saving demonstrated vs. electric boiler
Ion heating replacement effect by sector (2026)
SectorPrevious systemSavingNote
Nursing hospitalExisting heating plant71%KRW 26M saved over 5 months
Eel farm (Gochang)Bunker C oil boiler70%Oil to electricity conversion
Swimming poolElectric boiler70%Uniform, comfortable water temperature
Semiconductor plantHot water boiler50%Process hot water supply
Public sports centreGas boiler30%Carbon reduction recorded
Hotel (hot spring)Heat pump83%KRW 30M → 5M per month

FAQ

Frequently asked questions

Which site achieved the biggest saving?

A nursing hospital cut heating cost by 71%, saving KRW 26 million over five winter months. A Gochang eel farm cut energy cost 70% after switching from Bunker C oil, and a swimming pool recorded 70% less power than an electric boiler. Savings depend heavily on the previous equipment.

Do you have cases in my sector?

As of 2026 around 100 sites are covered, including hotels and lodging, swimming pools and water parks, nursing hospitals, dormitories, industrial plants, food processing, fish farms and barns, saunas, public sports centres, religious facilities and solar homes. Tell us your sector and we will send comparable cases.

Can you supply public institutions?

Yes. The company is registered with the Public Procurement Service and has delivered to the Busan City public institution testbed project, Seo-gu Songdo Sports Centre and the WTC Seoul testbed project.

Can installation happen while we stay open?

Usually yes. Existing piping is reused and no outdoor unit or flue work is needed, so a typical site is finished in one to three days. Hotels and pools operating around the clock are handled by sequential floor-by-floor or zone-by-zone installation.

CONTACT

Will it work at our site?
One phone call is all it takes.

We analyse your usage pattern and equipment, then provide a savings simulation free of charge. Weekdays 09:00–18:00.

TOP