REFERENCE

Installation Cases

Heating, hot water and drying solutions — experience across many sectors proven by results on site.

Total 100

What 100 sites recorded

Every installation record from around 100 sites as of 2026. Savings vary with the previous equipment, usage pattern and electricity tariff.

  • 71%Nursing hospital heating cost — KRW 26M saved in five months
  • 70%Gochang eel farm — switched from Bunker C oil
  • 66%Lotte World — power saving demonstrated vs. electric boiler
Ion heating replacement effect by sector (2026)
SectorPrevious systemSavingNote
Nursing hospitalExisting heating plant71%KRW 26M saved over 5 months
Eel farm (Gochang)Bunker C oil boiler70%Oil to electricity conversion
Swimming poolElectric boiler70%Uniform, comfortable water temperature
Semiconductor plantHot water boiler50%Process hot water supply
Public sports centreGas boiler30%Carbon reduction recorded
Hotel (hot spring)Heat pump83%KRW 30M → 5M per month

Case List

Reference sites (15)

Page 1 / 1

Care & hospital ion heating installation

Care & hospital

Nursing hospital cuts heating cost 71% — KRW 26M saved over five months

Care & hospital ion heating installation

Care & hospital

Care facility heating on electricity alone — 100 pyeong covered by a single NE334

Gyeongnam Care & hospital ion heating installation

Care & hospitalGyeongnam

Smaller care homes need simple warmth — Jinju care home covered by one ion heating boiler

Gyeongnam Care & hospital ion heating installation

Care & hospitalGyeongnam

100 pyeong heated by ion heating — Yangsan care home cuts electricity cost over 40%

Daegu Care & hospital ion heating installation

Care & hospitalDaegu

Instead of the harsh draught of a heat pump, a warmer and more comfortable space

Daegu Care & hospital ion heating installation

Care & hospitalDaegu

Neither heat pump nor gas boiler — 600 pyeong new silver town integrates heating and hot water

Gyeongbuk Care & hospital ion heating installation

Care & hospitalGyeongbuk

Noodles breaking at high temperature? Low-temperature drying secured both quality and energy cost

Care & hospital ion heating installation

Care & hospital

No dryness, no heating cost burden — Gapyeong care home covers all electricity at KRW 2.5M a month

Care & hospital ion heating installation

Care & hospital

End of the LPG bill shock — Wanju hospital cuts heating cost by over 50%

Chungnam Care & hospital ion heating installation

Care & hospitalChungnam

Hospital dormitory — 35% energy cost saving and carbon reduction from hot water conversion

Daegu Care & hospital ion heating installation

Care & hospitalDaegu

Daegu unmanned motel — energy saving with stable hot water and heating

Care & hospital ion heating installation

Care & hospital

Care training centre — heating and hot water integrated with ion heating

Daegu Care & hospital ion heating installation

Care & hospitalDaegu

Daegu care home — stable hot water and better whole-building heating efficiency

Care & hospital ion heating installation

Care & hospital

Gyeongsan care home — stable hot water and heating with ion heating

Care & hospital ion heating installation

Care & hospital

Goryeong care home — night-tariff boiler limits overcome, 600 pyeong stabilised

* Figures are measured against each site's previous equipment and operating conditions, and may differ with site conditions and electricity tariffs.

FAQ

Frequently asked questions

Which site achieved the biggest saving?

A nursing hospital cut heating cost by 71%, saving KRW 26 million over five winter months. A Gochang eel farm cut energy cost 70% after switching from Bunker C oil, and a swimming pool recorded 70% less power than an electric boiler. Savings depend heavily on the previous equipment.

Do you have cases in my sector?

As of 2026 around 100 sites are covered, including hotels and lodging, swimming pools and water parks, nursing hospitals, dormitories, industrial plants, food processing, fish farms and barns, saunas, public sports centres, religious facilities and solar homes. Tell us your sector and we will send comparable cases.

Can you supply public institutions?

Yes. The company is registered with the Public Procurement Service and has delivered to the Busan City public institution testbed project, Seo-gu Songdo Sports Centre and the WTC Seoul testbed project.

Can installation happen while we stay open?

Usually yes. Existing piping is reused and no outdoor unit or flue work is needed, so a typical site is finished in one to three days. Hotels and pools operating around the clock are handled by sequential floor-by-floor or zone-by-zone installation.

CONTACT

Will it work at our site?
One phone call is all it takes.

We analyse your usage pattern and equipment, then provide a savings simulation free of charge. Weekdays 09:00–18:00.

TOP