CONTACT

Product Inquiries

No drawings needed. One phone call is enough to check whether it fits your site.

How to Ask

Just three things

① current equipment ② monthly energy cost ③ heated or hot-water area. That is enough for an approximate savings simulation during the call. Consultation, survey and quotation are all free.

Process

From enquiry to installation

STEP 01

Phone / text consultation

We check your equipment and monthly cost and give an approximate saving. Same day.

STEP 02

Site survey

Piping layout, air handler position and electrical capacity. Same day in Busan/Gyeongnam, 2–3 days elsewhere.

STEP 03

Simulation & quotation

Measured savings simulation plus product and installation quotation. Free of charge.

STEP 04

Install & monitor

1–3 days at a typical site. TBTL monitoring then tracks actual savings.

Information

Contact details

NEW ENERGY Co., Ltd. enquiry and visit information
CompanyNEW ENERGY Co., Ltd.
CEOKIM NOEUL
TEL+82-51-791-1129
FAX+82-70-8650-1129
E-mailn.energy19@gmail.com
Address1436, Nakdong-daero, Sasang-gu, Busan, Republic of Korea
HoursWeekdays 09:00 – 18:00 KST (closed weekends & holidays)

FAQ

What information do you need first?

Three things are enough: your current equipment (gas, electric, heat pump or oil boiler), monthly energy cost, and the heated or hot-water area and capacity. With that we can produce an approximate savings simulation during the call. Drawings and equipment specifications are not required.

Is there a charge for consultation or a site survey?

Phone consultation, savings simulation and site survey are all free of charge, with no cost up to the quotation stage. Same-day visits are possible in Busan and Gyeongnam subject to scheduling; elsewhere we normally visit within two to three days.

Can we start with zero upfront cost?

Yes. Through the 2026 partnership with KEPCO-ES, a KEPCO subsidiary, construction cost is paid upfront by KEPCO-ES and repaid by the customer from the electricity savings, allowing zero initial cost. Eligibility is confirmed during consultation.

How long does installation take?

Consultation, survey and quotation typically take three to seven days, and installation itself one to three days at a normal site. Existing water and air handling piping is reused and no outdoor unit, refrigerant, gas piping or flue work is needed, so many sites continue operating during installation.

CONTACT

Will it work at our site?
One phone call is all it takes.

We analyse your usage pattern and equipment, then provide a savings simulation free of charge. Weekdays 09:00–18:00.

TOP